NTPC CEO Resigns

The CEO of the Northwest Territories Power Corporation is stepping down.

NTPC has confirmed that Emanuel DaRosa is resigning as president and Chief Executive Officer of the electrical company.

DaRosa joined the power corporation in the fall of 2011.

NTPC Communications were not able to confirm the reason for DaRosa’s resignation.

Continue Reading

You may also like



cjcd Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

Normal Wells school joins list of 35 schools in NWT with high lead

Another school in the N.W.T. shows elevated levels of lead in drinking water, with eight sites about 400 times above the maximum drinking water standards. A message from the GNWT issued this evening read that water samples from the Mackenzie Mountain School in Norman Wells showed elevated levels of lead and copper. Water samples from 18 of the 22 fixtures tested above the guidelines for lead. Nearly half of the outlets on site, 8 of 22 fixtures showed elevated levels of copper

New post-secondary program for students in North could see fall launch

Collège Nordique Francophone is looking to bring a new business program to the territory, slated for a September start. The program is aimed at developing students’ understanding of how organizations are run and ways to support day to day business operations.

NTPC announces vegetation management program for 2026

The Northwest Territories Power Corporation says they will be engaging in an ambitious vegetation management program this year, mainly focused on six communities in the territory.  

Scientists say water level near Aklavik holding steady, but flood risk remains

Scientists with the territory’s Environment and Climate Change department say that water levels on the Peel Channel upstream from Aklavik held steady at 14. 4 meters as of the latest measures taken today. “Levels have held steady at approximately this level since the afternoon of May 23 when ice passed the community,” said the author’s of the report compiling water levels measured up to 11 a.m. on May 25.

NTPC estimates latest Taltson’s surge tank repair to cost about $1 M

NTPC says the source of a leak on the Taltson station’s newly repaired surge tank has been identified and the latest repair is estimated to cost about $1 million, including interim diesel fuel costs, with a return to hydro service anticipated this week.