100.1 GO FM - We're Your Feel Good Pop Station

Stanton decides to hold off on new IV & chemotherapy unit

Yellowknife’s Stanton Hospital has postponed construction of a new chemotherapy and IV treatment unit.

The hospital has decided that, with a major project to rebuild Stanton so close, building a new chemo suite now would be a waste of funds.

Any new suite would only be operational for a few years before being superseded by the broader Stanton renovation, the hospital concluded.

Plans for the full Stanton renovation include a full, dedicated chemotherapy and IV unit.

Read: Stanton security – what’s changing, what staff can do

“If all goes well, the [new-look] hospital could get under construction sooner rather than later,” said Rebecca Alty, executive director of the hospital foundation.

“We said, ‘Stop, let’s take a look, does it still make sense to fundraise for this project?’ So the hospital had a consultant look and they realized two things.

“One, the costs had gone up quite a bit, and two, if we were to renovate right away, it would only benefit the operations for four to six years, or whenever the new space is ready.”

At the moment, patients requiring chemotherapy or IV treatments share space with endoscopy services and cardiac stress tests at Stanton’s medical day care unit.

Alty says that unit can feel cramped – “like everything in the hospital, it’s bursting at the seams” – which was partly why plans for a new chemo suite were drawn up in 2011, when the full renovation of Stanton seemed a distant prospect.

Read: Timeline up to the start of Stanton Renewal construction

More than $200,000 has since been raised for a chemo suite but, with construction of the revamped Stanton set to begin as soon as this winter, the chemo suite project has been set aside and the funds will be used elsewhere.

“We decided it wouldn’t be an efficient use of donor dollars,” said Alty.

She believes postponing the project, and waiting for the suite inside the new-look Stanton to open in the future, will be of minimal inconvenience to patients.

In consultation with donors, funds have been redirected to projects like iPads for each of the current chemo and IV treatment chairs, breast screening database software, and an infant resuscitator and exam lights for the obstetrics unit.

Ollie Williams
Ollie Williams
Hello! I'm the one with the British accent. Thanks for supporting CJCD. To contact me, you can email me, find me on Twitter or call (867) 920-4663.

Continue Reading

You may also like



cjcd Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

A number of water fixtures test positive for lead in two more NWT schools

Two more schools in the territory have tested positive for lead in some of their drinking water fixtures. The GNWT announced today that they received lead testing results for Elizabeth Mackenzie Elementary School in Behchokǫ̀ and École St. Joseph School in Yellowknife. The two schools join a growing list of 14 other schools out of 20 tested schools in the N.W.T. that have tested positive for elevated lead in drinking water.

Police believe fraud suspect may have fled to Nova Scotia

A 59-year old suspect is facing charges in an alleged incident of fraud following an investigation that began last year in Fort Providence. Police said the suspect may no longer be in the territory but a warrant has been issued for their arrest. The charges stem back to suspected fraud activity that allegedly occurred at a service station in the community of Fort Providence.

MLAs call for action on the Mackenzie Valley Highway

Members of the Northwest Territories Legislative Assembly are calling for the territorial and federal governments to commit to the construction of the Mackenzie Valley Highway.   

City releases progress update on Downtown Safety Initiative

A progress update on the Downtown Safety Initiative highlights suggestions for both long-term and short-term ways the area can be supported.

Support When You Need It

Our hearts are with the entire Tumbler Ridge community...